The SCORE H&S preparation line was originally designed with four initiation points, allowing product flow from both ends toward the center. Through Project SCORE, the line underwent a redesign to standardize equipment, incorporate best practices from across the global network, and drive greater economies of scale.
Smarter flow. Bigger scale.